Documents
Scheduled Task (Timed Tour)
1. Periodic execution
① On the software home page, click “计划任务(Scheduled Task)” on the right.

② In the Scheduled Task panel, set the corresponding parameters.
⑴ Task name: a custom name.
⑵ Time selection: set the time point of execution.

③ Action: choose to run a saved scene or tour.
Click the select button “”


② Select the saved scene to run and double-click to confirm; when the parameters are set, click the Add button.

⑤ When the task is added, it appears in the scheduled task list on the left; click the enable button after it to enable the task and the device switches scenes automatically at the set time.

⑥ To modify an existing scheduled task, click the edit button “” after the task; the settings panel on the right then reads the current task parameters. Change them and click “Save Changes”/“”.



Did this page help you?One line of feedback helps us keep the steps accurate.