Skip to main content

Scheduled Task (Timed Tour)

1. Periodic execution​

① On the software home page, click “计划任务(Scheduled Task)” on the right.

Figure 89

② In the Scheduled Task panel, set the corresponding parameters.

⑴ Task name: a custom name.

⑵ Time selection: set the time point of execution.

Figure 90

③ Action: choose to run a saved scene or tour.

Click the select button “”

Figure 91

Figure 92

② Select the saved scene to run and double-click to confirm; when the parameters are set, click the Add button.

Figure 93

⑤ When the task is added, it appears in the scheduled task list on the left; click the enable button after it to enable the task and the device switches scenes automatically at the set time.

Figure 94

⑥ To modify an existing scheduled task, click the edit button “” after the task; the settings panel on the right then reads the current task parameters. Change them and click “Save Changes”/“”.

Figure 95

Figure 96

Figure 97